This project is by far the most extravagant precast panel project under taken by APPS comprising of 976 structural wall panels required for levels 1 to 8 and 757 non-structural cladding panels required for the ground floor areas. The walls feature high decorative patterns and smooth off white concrete, commencing in October 2013 the production of these panels spanned 12 months till October 2014, the task of producing and installing these panels while monumental highlights our ability to deliver projects of this size and complexity. The project was completed in time for the 2015 academic year and it will provide an impressive addition to the Callaghan campus.

APPS would like to thank all those that came together on the project to create a great result.